Contact

Talk to Netafim about drip, micro sprinklers and smart controls

Share crop type, hectares and water source. Irrigation engineers reply with a scoped next step—not an empty brochure pack. Orchard, greenhouse and open-field projects are all accepted through the same desk.

Project desk

Address

Irrigation Project Desk
2400 Precision Agronomy Way
Fresno, CA 93725, USA

Phone & email

+1 (559) 555-0148
[email protected]

Hours

Mon–Fri 08:00–17:30 PT
Seasonal saturation desk Apr–Sep

Follow field notes: Blog Smart Farming
Map illustration of Netafim project desk location

Irrigation project inquiry

Two-column form fields keep RFQs fast. Include fertigation and controller needs in the project details box.

What to include so we can size laterals correctly

Irrigation quotes stall when RFQs omit water quality or elevation. Tell us crop type, planted hectares, source water (well, canal or recycled), current filtration and whether you need drip tape, micro sprinklers or a hybrid layout. If fertigation is planned, list nutrient recipe frequency and whether acid flush cycles must stay on a separate manifold.

Controller buyers should note valve group count, VFD pump presence and whether soil moisture probes already exist. GLOBALG.A.P. or HACCP-linked farms can request document pathways for irrigation water records; we will clarify what Netafim can supply versus what remains a grower audit responsibility.

Dealer introductions are available for regions where commissioning and spare-parts staging must be local. Expect a scoped reply covering emitter class, filter mesh, fertigation readiness and controller I/O—not a generic price list pasted from a catalog.

For smart-farming add-ons, describe connectivity constraints in the field (cellular, radio or wired) so sensor and gateway recommendations stay serviceable after install crews leave.

Urgent season requests (broken laterals, plugged filters or controller faults) should mark “seasonal desk” in the project details field. We route those tickets ahead of greenfield design RFQs whenever parts availability allows a same-week response.